Download free PDF

US Data Center Renovation Market Size & Share 2026-2035

Report ID: GMI15259
   |
Published Date: November 2026
 | 
Report Format: PDF/Excel/Dashboard/Platform
Explore Our Licensing Options:

US Data Center Renovation Market Size

The US data center renovation market was valued at USD 8.91 billion in 2025, is projected to reach USD 10.43 billion in 2026, is expected to grow at a 12.4% CAGR (2026-2035), and is projected to reach USD 28.63 billion by 2035. The market covers retrofit, modernization, upgrade, and adaptive-reuse investment in existing U.S. data center facilities, spanning power, cooling, enclosures, networking, monitoring, fire protection, and associated structural systems.

US Data Center Renovation Market Key Takeaways

2025 Market Size
$ 8.91 Billion
2026 Market Size
$ 10.43 Billion
2035 Forecast Market Size
$ 28.63 Billion
CAGR (2026–2035)
12.4%
Regional Dominance
Largest Market
United States
Fastest Growing Country
Not specified
Key Players
  • Market Leader: Vertiv Group led with over 15.0% market share in 2025.

  • Leading Players: Top 5 players in this market include Vertiv Group, Schneider Electric, Eaton Corporation, Legrand S.A., nVent Electric, which collectively held a market share of 37.5% in 2025.

The market has become a distinct capital-allocation channel as operators confront legacy infrastructure constraints alongside higher-density AI workloads and more exacting energy-performance expectations. Renovation offers a route to unlock capacity within established facilities where new construction faces extended power procurement, permitting, and civil-development timelines. Consequently, operators are increasingly treating retrofit programs as a capacity strategy rather than a maintenance obligation.

GMI Analyst View

Based on input from engineering and procurement leads across hyperscale and colocation operators, the market handled approximately 940 MW of renovated IT capacity in 2025. We view this installed-base activity as evidence that existing facilities are becoming an essential delivery channel for near-term AI and cloud capacity, particularly where proven sites, operating teams, and utility relationships can shorten deployment risk.

US Data Center Renovation Market Trends, Growth Drivers & GMI Forecast Outlook

AI-density requirements, aging mechanical-electrical infrastructure, and efficiency compliance are converging to increase renovation intensity across U.S. facilities. Growth remains conditioned by the availability of capital, utility capacity, and execution methods that preserve uptime during complex live-site upgrades.

Key Drivers

DriverEvidence signalMarket-demand implicationGMI forecast condition
AI-driven hyperscaler infrastructure investmentEight major hyperscalers forecast combined capital expenditure of US$371 billion on AI data centers and computing resources in 2025 [1]Existing facilities face immediate retrofit requirements to accommodate GPU-dense AI racks demanding significantly higher power densities than legacy configurations, requiring power distribution, cooling plant, and structural upgrades within operational timelinesSustained hyperscaler CapEx through 2027 supports double-digit renovation growth; model efficiency gains or investment pauses represent a demand deceleration risk for the 2029-2031 period
Aging data center infrastructure baseAbout half of data center facilities globally are more than 10 years old, approaching or exceeding their 10-to-15-year design lifespan [2]US operators face compulsory MEP replacement cycles as power, cooling, and fire protection systems cross vendor-support and design-life thresholds, independent of AI-related demandAge-driven replacement backlog sustains renovation demand regardless of AI cycle variability; deferred investment signals an accelerated catch-up wave concentrated in 2027-2030
Energy efficiency compliance and PUE optimization mandatesASHRAE 90.4-2022 tightened mechanical load component and electrical loss component thresholds across 19 climate zones; US state-level legislation increasingly ties data center tax exemptions and permits to PUE compliance targetsOperators are redesigning cooling plant, power distribution, and building management systems to maintain regulatory eligibility and reduce power utility expenditureState compliance timelines in Virginia, California, and Texas concentrate project awards in 2026-2028; non-compliant legacy facilities face stranded-asset risk by 2030 if renovation is deferred

Evidence anchors use cited external data; demand implications and forecast conditions represent GMI analysis.

AI deployments change the technical scope of renovation because legacy designs were optimized for lower-density, predominantly air-cooled computing. Higher thermal loads require coordinated changes to electrical distribution, cooling loops, rack support, controls, and sometimes floor loading. This makes renovation programs more integrated and raises the value of vendors and contractors able to sequence several systems without disrupting service. Deloitte reports a sharp acceleration in AI infrastructure investment, reinforcing the urgency of capacity-enabling retrofits [1].

The installed-base cycle provides a separate source of demand. Facilities built during earlier cloud-expansion waves can require replacement of supported equipment and modernization of power, cooling, and life-safety systems even when AI capacity is not the immediate project trigger. The aging profile identified by Uptime Institute points to a broad replacement backlog rather than a narrow technology cycle [2]. JLL also identifies sustained U.S. demand despite power challenges, supporting the case for refurbishment in operating locations where redevelopment capacity is constrained [3].

Efficiency requirements further shift renovation decisions from optional improvement to commercial necessity. Operators are redesigning plant controls, distribution systems, and cooling configurations to reduce energy overhead, protect permitting and incentive eligibility, and improve operating economics. Projects are likely to cluster around state and utility compliance schedules, particularly where performance disclosure or tax-treatment conditions tighten.

Key Restraints

RestraintEvidence signalMarket-demand implicationGMI forecast condition
High upfront investment requirements for large-scale renovationUS data center financings reached $30 billion in 2024 [4], reflecting the significant capital commitment required across the sectorSmaller colocation operators, enterprise data center owners, and regional edge providers face credit and budgeting constraints that delay or phase renovation scope, limiting participation in the near-term renovation cycleCapEx access bifurcation favors hyperscalers and large colocation operators through 2028; enterprise and edge renovation acceleration requires improved financing structures or government-backed programs in the 2029-2035 window
Grid interconnection delays constraining renovation commissioning timelinesCenterPoint Energy received requests for 8 GW of new large-load data center connections in late 2024, illustrating system-wide interconnection queue congestion [5]Renovation projects requiring upgraded power feeds or expanded utility connections face substation and transmission buildout timelines that extend commissioning by years, compressing the addressable renovation window per facilityPower-constrained markets such as Northern Virginia, Silicon Valley, and Phoenix create capacity rationing that may divert renovation spending to secondary markets with available power, moderating headline growth in primary clusters through 2029
Operational continuity requirements during live-system renovationTier III and Tier IV data center classifications maintain N+1 and 2N redundancy standards, requiring MEP replacement work to proceed under live-load conditions with no single point of failure acceptable during active system changeoverRenovation projects must be sequenced around uptime commitments, increasing project duration and contractor coordination costs compared with greenfield construction, and limiting concurrent scope within any single facilityLive-system renovation complexity supports multi-year contractor engagement models; operators that invest in modular and prefabricated infrastructure solutions can compress timelines, shifting competitive advantage toward vendors with parallel-swap deployment capability

Evidence anchors use cited external data; demand implications and forecast conditions represent GMI analysis.

Large renovations compete for capital with new capacity, IT refresh, and enterprise digital-transformation programs. Larger operators can combine equipment purchasing power, established financing access, and repeatable facility designs, while smaller owners more often phase projects by critical system. The financing environment underscores the capital intensity of the sector and the potential for unequal participation across operator classes [4].

Power availability can turn an otherwise viable retrofit into a delayed commissioning event. Where a project increases a facility's electrical load, the utility study process and downstream transmission or substation work may set the effective project schedule rather than the construction plan. Grid connection delays documented by Camus Energy illustrate why operators may prioritize sites with existing headroom or redirect activity to less constrained markets [5].

Live-site delivery also limits execution flexibility. Contractors must protect redundancy paths, tenant commitments, and service-level agreements while removing or replacing critical systems. Modular, prefabricated, and parallel-swap approaches can reduce exposure, but they require specialized engineering, disciplined commissioning, and tight coordination between facility, utility, equipment, and construction teams.

GMI Analyst View

We see a bifurcated demand environment emerging: hyperscale and large colocation operators can advance high-value thermal and power upgrades, while many enterprise and edge owners remain constrained by financing, utility access, and outage-risk management. The resulting mix favors projects that unlock density within an already power-secure footprint rather than broad, discretionary modernization.

US Data Center Renovation Market Segment Analysis

By Product

Power Infrastructure accounted for 29.0% of the market in 2025 and is projected to grow at an 11.5% CAGR (2026-2035). Power-system upgrades remain foundational because switchgear, UPS architectures, generators, and distribution paths must accommodate higher critical loads while preserving redundancy. However, the segment's relative growth profile reflects the increasing budget share directed toward thermal management and data-center controls.

Us Data Center Renovation Market Size By Product 2025 And 2035 Usd Billion
Us Data Center Renovation Market Size By Product 2025 And 2035 Usd Billion

Cooling Infrastructure is projected to reach USD 9.53 billion by 2035 and expand at a 15.8% CAGR (2026-2035). The segment benefits directly from the mismatch between legacy air-cooling systems and AI-oriented rack configurations. Direct-to-chip cooling, coolant distribution, rear-door heat exchange, and upgraded air-handling equipment are moving from specialized deployments into core retrofit scope for facilities pursuing denser compute environments.

IT Racks & Enclosures generated USD 1.15 billion in 2025 and are expected to grow at a 12.5% CAGR (2026-2035). Renovation demand is tied to the physical requirements of heavier hardware, higher-gauge cabling, liquid-cooling components, and revised airflow management. Operators replacing enclosures are also improving serviceability and space utilization, making the category an enabling layer for broader power and cooling upgrades.

Networking Equipment is projected to reach USD 3.04 billion by 2035 and grow at a 13.0% CAGR (2026-2035). Network-refresh programs follow the need for higher throughput, lower latency, and more resilient east-west traffic handling in AI and cloud environments. These projects commonly accompany infrastructure work but can occur later in the renovation cycle as operators transition fabrics and optics without disrupting production workloads.

DCIM & Monitoring held an 8.0% share in 2025 and is forecast to grow at a 17.5% CAGR (2026-2035). The segment's momentum reflects the operating need to monitor per-rack electrical demand, thermal conditions, cooling-system performance, and capacity utilization in real time. Modernization increasingly requires a unified view of physical infrastructure, particularly where operators must verify efficiency gains and manage mixed air- and liquid-cooled environments.

Fire Protection & Security represented USD 535.0 million in 2025 and is projected to account for 5.3% of market revenue by 2035. Renovation activity includes end-of-life suppression-system replacement, revised detection approaches for dense equipment environments, and upgrades to physical access and facility monitoring. These systems are often bundled into wider control-system or MEP programs because certification, insurance, and operational-risk requirements must remain intact throughout the upgrade.

By Data Center Type

Hyperscale facilities represented 68.0% of renovation revenue in 2025 and are projected to account for 58.8% by 2035. Their continuing scale reflects the concentration of large AI and cloud capacity programs among a limited set of operators. The share shift indicates that other facility types are also moving into more intensive retrofit cycles, not a reduction in hyperscale renovation activity.

Colocation is projected to generate USD 6.49 billion by 2035 and expand at a 13.5% CAGR (2026-2035). Owners must reconcile the needs of incumbent tenants with incoming high-density deployments, making renovation scheduling and change control especially demanding. Upgrades to landlord-controlled MEP infrastructure can determine whether a site can retain strategic tenants or attract new AI-oriented workloads.

Enterprise facilities generated USD 891.6 million in 2025 and are expected to grow at an 18.5% CAGR (2026-2035). Financial services, healthcare, and public-sector operators are evaluating upgrades where data sovereignty, latency, and control requirements limit reliance on public cloud. These projects often involve measured, staged improvements to support hybrid architectures and selective on-premises AI inference.

Edge data centers are projected to reach USD 562.6 million by 2035 and expand at a 20.5% CAGR (2026-2035). Their projects are smaller at the site level but can be numerous across telecommunications, distributed enterprise, and retail networks. Demand is increasingly linked to local inferencing workloads that require more power and heat removal than legacy edge sites were designed to provide.

By Renovation Type

Infrastructure Modernization held a 33.0% share in 2025 and is forecast to grow at a 10.5% CAGR (2026-2035). Broad MEP replacement remains the recurring base of the market because aging facilities ultimately require coordinated renewal of power, cooling, protection, and control systems. The category is comparatively mature, but it remains essential where deferred maintenance has become a resilience risk.

Us Data Center Renovation Market Share By Renovation Type 2025
Us Data Center Renovation Market Share By Renovation Type 2025

Capacity Expansion is projected to reach USD 10.07 billion by 2035 and grow at a 15.8% CAGR (2026-2035). Operators use existing sites to add usable IT load, cooling capacity, and denser white-space configurations where greenfield development is slower or power-secure real estate is scarce. These programs are particularly valuable when site connectivity, permits, and operational teams are already established.

Energy Efficiency Upgrades generated USD 1.33 billion in 2025 and are expected to expand at a 14.5% CAGR (2026-2035). Cooling optimization, variable-speed equipment, economization, power-chain improvements, and control-system replacement are central to these projects. The business case combines lower operating costs with stronger compliance readiness and support for sustainability commitments.

IT Infrastructure Refresh is projected to reach USD 3.82 billion by 2035 and grow at a 13.5% CAGR (2026-2035). Server, storage, network, and cable-plant replacement is being accelerated by AI workload requirements and shorter technology obsolescence cycles. The renovation opportunity extends beyond hardware replacement because new equipment often triggers associated changes in racks, power distribution, and thermal management.

Adaptive Reuse/Conversion accounted for 8.0% of market revenue in 2025 and is projected to reach USD 1.88 billion by 2035. This category converts industrial, warehouse, and other large-footprint properties into operational data centers where site characteristics or available power offer an alternative to constrained primary locations. Conversion projects demand extensive infrastructure work but can shorten the path to deployable capacity when a suitable building and utility position already exist.

By End Use

BFSI held a 24.0% share in 2025 and is projected to grow at a 12.5% CAGR (2026-2035). The sector renovates mission-critical environments to support real-time analytics, fraud detection, trading, and data-retention workloads while preserving strict resilience requirements. Conservative change-management practices can elongate procurement, but they also sustain demand for proven delivery methods and specialized contractors.

IT & Telecom is projected to generate USD 6.40 billion by 2035 and grow at a 14.0% CAGR (2026-2035). Cloud-service providers, carrier facilities, and telecommunications operators are upgrading infrastructure for hybrid enterprise workloads, distributed AI, and network densification. The addressable work ranges from regional data center retrofits to central-office modernization, creating technically varied demand across the country.

Government & Defense represented 11.0% of market revenue in 2025 and is forecast to account for 11.2% by 2035. Renovation demand is supported by modernization mandates, cybersecurity requirements, and adoption of advanced analytics across government operations. Projects frequently prioritize resilient infrastructure, physical security, and controlled environments for sensitive workloads.

Healthcare & Life Sciences is projected to reach USD 3.12 billion by 2035 and expand at a 15.5% CAGR (2026-2035). Medical imaging, genomics, drug discovery, and clinical decision-support applications are increasing compute requirements within highly regulated environments. Renovation can be preferred where data-governance obligations, latency needs, or workflow integration make local infrastructure strategically important.

Retail & E-Commerce generated USD 891.6 million in 2025 and is expected to hold an 8.9% share by 2035. Retailers are upgrading facilities that support personalization, inventory optimization, logistics platforms, and distributed fulfillment operations. The sector's mix reflects both migration to cloud resources and continued investment in low-latency systems close to operational networks.

Manufacturing & Automotive is projected to reach USD 2.23 billion by 2035 and grow at a 14.5% CAGR (2026-2035). Renovation activity supports industrial AI, computer vision, digital-twin modeling, predictive maintenance, and software-defined vehicle development. Proximity to production environments can favor local or regional data-center capacity where latency and operational continuity are material.

Energy & Utilities represented 6.0% of revenue in 2025 and are forecast to grow at a 15.0% CAGR (2026-2035). Utilities and energy operators are improving computing environments for grid analytics, demand forecasting, asset management, and cybersecurity. The modernization requirement is amplified where operational technology systems must coexist with more data-intensive IT and analytics platforms.

Media & Entertainment is projected to reach USD 1.46 billion by 2035 and accounted for 6.0% of revenue in 2025. Demand stems from AI-enabled production, content processing, streaming, storage modernization, and content-moderation workloads. These users increasingly require fast, high-capacity infrastructure that can support both large media files and latency-sensitive production workflows.

GMI Analyst View

We expect the product mix to shift from conventional power-led replacement toward integrated thermal, electrical, and monitoring upgrades. This favors suppliers and delivery teams that can coordinate liquid cooling, high-density power distribution, and operational visibility as one renovation program. Enterprise and edge demand should broaden the project base as AI requirements move beyond hyperscale campuses.

US Data Center Renovation Market Regional Analysis

United States Data Center Renovation Market Analysis

The data center renovation market in the United States is projected to handle approximately 1,067 MW of renovated IT capacity in 2026 and 2,357 MW by 2035. Activity remains concentrated in established clusters, but the renovation pipeline is widening as facilities in secondary markets reach major modernization windows and operators seek locations with more favorable utility capacity.

Northern Virginia, Silicon Valley, Chicago, Dallas-Fort Worth, Phoenix, and Atlanta remain important centers for complex retrofit work because they contain substantial installed infrastructure and dense customer ecosystems. At the same time, grid constraints are encouraging site selection and renovation planning in markets with available substation capacity, established fiber routes, and less congested contractor schedules. JLL's assessment of continued U.S. data-center demand despite power challenges supports this widening geographic pattern [3].

GMI Analyst View

We view geographic diversification as a selective reallocation rather than a departure from established clusters. Primary markets retain deep installed bases and sophisticated delivery ecosystems, but secondary locations can offer a more executable combination of power access, construction capacity, and timeline certainty. This changes where renovation awards occur and increases the strategic value of utility-ready sites.

US Data Center Renovation Market Share & Competitive Landscape

The US data center renovation market share structure is moderately fragmented, with the top five include Vertiv Group, Schneider Electric, Eaton Corporation, Legrand S.A., and nVent Electric, which collectively held a market share of 37.5% in 2025. Competition operates across two interconnected layers: technology suppliers provide power, thermal, enclosure, and monitoring systems, while EPC and specialty MEP firms manage installation, live-site coordination, commissioning, and project delivery.

Vertiv Group held a 15.0% revenue share in 2025. Its position is supported by mission-critical power, thermal-management, and monitoring offerings that are regularly specified in hyperscale and colocation retrofit designs. Service capability, delivery reliability, and familiarity with standardized commissioning processes are important advantages when operators must execute upgrades within narrow operating windows.

Schneider Electric held a 9.0% revenue share in 2025. Its competitive position combines power infrastructure, EcoStruxure-based monitoring, and an expanding thermal-management portfolio. This breadth supports integrated pursuits where customers seek to coordinate electrical, cooling, and controls work through fewer technology interfaces.

Eaton Corporation held a 6.0% revenue share in 2025. The company is positioned around UPS, power distribution, electrical components, and solutions tailored to higher-density computing environments. Its relevance rises as customers assess more advanced power architectures and seek equipment suppliers able to support design, deployment, and lifecycle service requirements.

Legrand S.A. and nVent Electric participate in the leading technology-vendor tier through power distribution, enclosure, and thermal-management offerings. Their competitive role is strengthened in projects where product compatibility, speed of installation, and access to specialized components influence the renovation schedule.

The EPC and specialty contracting layer remains broad. Balfour Beatty US, Clayco, DPR Construction, Hensel Phelps, Mortenson Construction, Skanska USA, and Turner Construction compete for major programs through data-center experience, program controls, safety performance, prefabrication capability, and established client relationships. Clune Construction, Fortis Construction, Holder Construction, Rosendin Electric, Southland Industries, TDIndustries, and Walsh Group bring regional labor networks and mechanical-electrical self-performance capability to colocation, enterprise, and edge projects. Bergelectric, Faith Technologies (FTI), Helix Electric, Limbach Holdings, Morrow-Meadows Corporation, and Structure Tone (STO Building Group) are active in specialized electrical, mechanical, and controls work where live-site execution expertise can be a meaningful differentiator.

Recent Industry Developments

September 2025 - Schneider Electric: Schneider Electric introduced a liquid- and air-cooled thermal-management portfolio under the Motivair by Schneider Electric brand following its acquisition of a controlling interest in Motivair earlier in 2025. The launch expands its ability to address retrofit requirements for high-density AI deployments across hyperscale and colocation facilities [6].

July 2025 - Eaton Corporation: Eaton announced a collaboration with NVIDIA focused on design practices, reference architectures, and power-management solutions for GPU-dense AI data centers. The initiative supports Eaton's positioning in renovation programs that require next-generation electrical infrastructure and coordinated high-density deployment planning [7].

Need a specific section of this report?

Purchase regional analysis, country-level analysis, company profiles, or any other segment-level insights separately
based on your research needs.


Authors:  Preeti Wadhwani, Satyam Thakare

Frequently Asked Questions (FAQs):

The us data center renovation market size was estimated at USD 8.91 billion in 2025 and is expected to reach USD 10.43 billion in 2026.
The market is projected to reach USD 28.63 billion by 2035, growing at a CAGR of 12.4% from 2026 to 2035.
United States currently holds the largest share of the us data center renovation market in 2025.
Not specified is projected to be the fastest-growing country during the forecast period.
Some of the major players in us data center renovation market include Vertiv Group, Schneider Electric, Eaton Corporation, Legrand S.A., nVent Electric.

Research methodology, data sources & validation process

This report draws on a structured research process built around direct industry conversations, proprietary modelling, and rigorous cross-validation and not just desk research.

Our 6-step research process

  1. 1. Research design & analyst oversight

    At GMI, our research methodology is built on a foundation of human expertise, rigorous validation, and complete transparency. Every insight, trend analysis, and forecast in our reports is developed by experienced analysts who understand the nuances of your market.

    Our approach integrates extensive primary research through direct engagement with industry participants and experts, complemented by comprehensive secondary research from verified global sources. We apply quantified impact analysis to deliver dependable forecasts, while maintaining complete traceability from original data sources to final insights.

  2. 2. Primary research

    Primary research forms the backbone of our methodology, contributing nearly 80% to overall insights. It involves direct engagement with industry participants to ensure accuracy and depth in analysis. Our structured interview program covers regional and global markets, with inputs from C-suite executives, directors, and subject matter experts. These interactions provide strategic, operational, and technical perspectives, enabling well-rounded insights and reliable market forecasts.

  3. 3. Data mining & market analysis

    Data mining is a key part of our research process, contributing nearly 20% to the overall methodology. It involves analysing market structure, identifying industry trends, and assessing macroeconomic factors through revenue share analysis of major players. Relevant data is collected from both paid and unpaid sources to build a reliable database. This information is then integrated to support primary research and market sizing, with validation from key stakeholders such as distributors, manufacturers, and associations.

  4. 4. Market sizing

    Our market sizing is built on a bottom-up approach, starting with company revenue data gathered directly through primary interviews, alongside production volume figures from manufacturers and installation or deployment statistics. These inputs are then pieced together across regional markets to arrive at a global estimate that stays grounded in actual industry activity.

  5. 5. Forecast model & key assumptions

    Every forecast includes explicit documentation of:

    • ✓ Key growth drivers and their assumed impact

    • ✓ Restraining factors and mitigation scenarios

    • ✓ Regulatory assumptions and policy change risk

    • ✓ Technology adoption curve parameter

    • ✓ Macroeconomic assumptions (GDP growth, inflation, currency)

    • ✓ Competitive dynamics and market entry/exit expectations

  6. 6. Validation & quality assurance

    The final stages involve human validation, where domain experts manually review filtered data to identify nuances and contextual errors that automated systems might miss. This expert review adds a critical layer of quality assurance, ensuring data aligns with research objectives and domain-specific standards.

    Our triple-layer validation process ensures maximum data reliability:

    • ✓ Statistical Validation

    • ✓ Expert Validation

    • ✓ Market Reality Check

Trust & credibility

10+
Years in Service
Consistent delivery since establishment
A+
BBB Accreditation
Professional standards & satisfaction
ISO
Certified Quality
ISO 9001-2015 Certified Company
150+
Research Analysts
Across 20+ industry verticals
95%
Client Retention
5-year relationship value

Verified data sources

  • Trade publications

    Industry journals, trade publications, and specialized media.

  • Industry databases

    Proprietary and third-party market databases

  • Regulatory filings

    Government procurement records and policy documents

  • Academic research

    University studies and specialist institution reports

  • Company reports

    Annual reports, investor presentations, and filings

  • Expert interviews

    C-suite, procurement leads, and technical specialists

  • GMI archive

    13,000+ published studies across 20+ industry verticals

  • Trade data

    Import/export volumes, HS codes, and customs records

Parameters studied & evaluated

Every data point in this report is validated through primary interviews, true bottom-up modelling, and rigorous cross-checks. Read about our research process →

Authors:  Preeti Wadhwani, Satyam Thakare
We use cookies to enhance user experience. (Privacy Policy)