Report Content
Chapter 1 Methodology & Scope
1.1 Research design
1.1.1 Research approach
1.1.2 Data collection methods
1.2 Base estimates and calculations
1.2.1 Base year calculation
1.2.2 Key trends for market estimates
1.3 Forecast model
1.4 Primary research & validation
1.4.1 Primary sources
1.4.2 Data mining sources
1.5 Market definitions
Chapter 2 Executive Summary
2.1 Industry 360-degree synopsis, 2021 - 2032
Chapter 3 Industry Insights
3.1 Industry ecosystem analysis
3.2 Supplier landscape
3.2.1 Equipment suppliers
3.2.2 Data center developers
3.2.3 Construction contractors
3.2.4 End users
3.3 Profit margin analysis
3.4 Technology & innovation landscape
3.5 Patent analysis
3.6 Key news & initiatives
3.7 Regulatory landscape
3.8 Impact forces
3.8.1 Growth drivers
3.8.1.1 Rapid infrastructure development of various application segments in Europe
3.8.1.2 Increasing adoption of cloud computing and IoT in Asia Pacific
3.8.1.3 Technological advancement in cloud-based solutions
3.8.1.4 Increasing number of new data centers in South America
3.8.1.5 Rapid urbanization and proliferation of smart consumer electronics devices
3.8.2 Industry pitfalls & challenges
3.8.2.1 Fluctuations in the semiconductor industry
3.8.2.2 High investments and installation costs
3.9 Growth potential analysis
3.10 Porter’s analysis
3.11 PESTEL analysis
Chapter 4 Competitive Landscape, 2023
4.1 Introduction
4.2 Company market share analysis
4.3 Competitive positioning matrix
4.4 Strategic outlook matrix
Chapter 5 Market Estimates & Forecast, By Data Center Type, 2021 - 2032 ($Bn)
5.1 Key trends
5.2 Small data center
5.3 Medium data center
5.4 Large data center
Chapter 6 Market Estimates & Forecast, By Infrastructure, 2021 - 2032 ($Bn)
6.1 Key trends
6.2 Electrical infrastructure
6.2.1 UPS
6.2.2 Power Distribution Units (PDUs)
6.2.3 Backup generators
6.2.4 Others
6.3 Mechanical infrastructure
6.3.1 Cooling Systems
6.3.2 HVAC
6.3.2.1 Computer room air conditioning (CRAC) units
6.3.2.1.1 Fan arrays
6.3.2.1.2 Air Flow measurement damper
6.3.2.1.3 DOAS
6.3.2.2 Precision Air Conditioning (PAC) units
6.3.2.2.1 Face mounted plenum fan with EC motor
6.3.2.2.2 MAU
6.3.2.2.3 ERV
6.3.2.3 Chilled water systems
6.3.2.3.1 Dampers
6.3.2.3.2 Condenser Fans
6.3.2.4 Ventilation systems
6.3.2.5 Direct expansion (DX) systems
6.3.2.6 Others
6.3.3 Racks
6.3.4 Ductwork
6.3.5 Raised Flooring
6.3.6 Others
6.4 Networking infrastructure
6.5 Others
Chapter 7 Market Estimates & Forecast, By End Use, 2021 - 2032 ($Bn)
7.1 Key trends
7.2 BFSI
7.3 Energy
7.4 Government
7.5 Healthcare
7.6 Manufacturing
7.7 IT & telecom
7.8 Others
Chapter 8 Market Estimates & Forecast, By Region, 2021 - 2032 ($Bn)
8.1 Key trends
8.2 North America
8.2.1 U.S.
8.2.2 Canada
8.2.3 Mexico
8.3 Europe
8.3.1 UK
8.3.2 Germany
8.3.3 France
8.3.4 Italy
8.3.5 Spain
8.3.6 Russia
8.3.7 Rest of Europe
8.4 Asia Pacific
8.4.1 China
8.4.2 India
8.4.3 Japan
8.4.4 Australia
8.4.5 South Korea
8.4.6 Southeast Asia
8.4.7 Rest of Asia Pacific
8.5 Latin America
8.5.1 Brazil
8.5.2 Argentina
8.5.3 Colombia
8.5.4 Chile
8.5.5 Rest of Latin America
8.6 MEA
8.6.1 UAE
8.6.2 Saudi Arabia
8.6.3 South Africa
8.6.4 Rest of MEA
Chapter 9 Company Profiles
9.1 AECOM Technology Corporation
9.2 AirTrunk Holding Limited
9.3 Alibaba Cloud
9.4 Amazon Web Services (AWS)
9.5 Apple iCloud
9.6 Aurecon Group Pty Ltd
9.7 Baidu Cloud
9.8 Chindata Group Holdings Limited
9.9 Digital Realty Trust, Inc.
9.10 DPR Construction, Inc.
9.11 Equinix, Inc.
9.12 Facebook (Meta)
9.13 GDS Holdings Limited
9.14 Global Switch Holdings Limited
9.15 Google Cloud Platform (GCP)
9.16 IBM Cloud
9.17 Microsoft Azure
9.18 NTT Global Data Centers Holding Corporation
9.19 Oracle Cloud Infrastructure (OCI)
9.20 Tencent Cloud